The work place where the steel is cut, shaped and assembled
into block by the design. Normally 150~200 Blocks are
needed for assemble one ship.
Dock
The work place where finally assemble blocks which manufactured
in the plant, primary outfitted in the outfitting area,
painted by the highly skilled workers into a ship. After
the final block was assembled, the dock is filled with
the sea-water for launching a ship.
Quay
The work -place where fitting works of the ship which
have been built at dock is done, and Various on-board
tests are finished before sea-trial.
Jib Crane
The equipment, setted up around docks
and quay, which lifts, moves and erects the blocks.